Present infrastructure service delivery, characterized by isolated supply streams for an uncontrolled demand, is uneconomical, inefficient, and ultimately unsustainable. What kinds of alternatives can be identified and implemented? In this project, we research and promote the establishment of Multi-Utility Service Companies, or MUSCos.
This project will develop improved methodologies and tools for assessing and providing more detailed information on complex system-user interactions, which will be further implemented in an integrated framework for system state identification, system or plant/component condition assessment and evaluation of the overall system performance (all currently performed in a number of separate studies).
The increasing amounts of renewable energy present on the national grid reduce C02 emissions caused by electrical power but they fit into an electrical grid designed for fossil fuels. Fossil fuels can be turned on and off at will and so are very good at matching variations in load. Renewable energy in the form of wind turbines is more variable (although that variability is much more predictable than most people think) and there is a need for existing power plants to operate much more flexibly to accommodate the changing power output from wind, tidal and solar power.